LR reveals MPV design

first_imgThe design is based on the existing 28,000 dwt NACKS 28K MPV. The new vessel is fitted with a 500 cu m LNG fuel containment system located aft and on deck over the engine room and the LNG fuel supply system.Three deck cranes (two with a 350-tonne capacity and one with a 100-tonne capacity) are situated on the port rail to offer some 800 tonnes of loading capacity.  www.nacks.com.cnwww.lr.orglast_img

Leave a Reply

Your email address will not be published. Required fields are marked *